Friday, January 13, 2017

A citizen asks . . . Sarasota County and the Benderson Agreement

This request to Sarasota County for detailed information regarding commitments and funding for the rowing facility at Nathan Benderson Park is from a citizen, Pat Rounds:

To the Sarasota County Commission, SANCA and Benderson Foundation Officials: 

According to the $5+ million World Rowing Championships (WRC)/Bi-County Reimbursement Agreement signed in 2013, parties to the agreement, including SANCA, must comply with public meetings/open records law (See attached, Sect 3Q). SANCA is also required to provide quarterly updates on fund-raising for capital projects to the WRC Events Committee (See attached Sect. 3M--Fundraising). Requests for details about the time/place of WRC Events Committee meetings have gone unanswered.

In the last two years, I have requested updates from Sarasota County, SANCA (Paul Blackketter) and/or Benderson Corp. (Todd Mathes) regarding private/corporate funding for the construction of Phase III structures/Capital Projects at Benderson Rowing Park (e.g., state-of-the-art finish tower, boat house, grandstands, and other amenities). These structures were noted in a Sarasota County press release in early September, 2013 after Benderson Rowing Park was selected to host the 2017 WRC. (See statement from press release* at the end of this message.)

Other than a copy of an e-mail message (See attached Aug 4 email/2015) containing a pledge of funding for the finish tower, no Phase III/Capital Projects funding data have been provided. In response to my last public info request, I was told that SANCA officials would be presenting an update at a BoCC Meeting in late October, 2016.

Below is a link to the video of the BoCC Meeting on 10/25/16. Item #24 is a presentation by Messrs. Robinson and Sullivan of SANCA:

http://sarasotacounty.granicus.com/MediaPlayer.php?view_id=41&clip_id=3527&meta_id=401582

While various park-related issues were discussed, there was no mention about the status of private/corporate funding for Phase III structures. Please indicate where the Phase III fund-raising update is on the video tape.

In the 2013 bid package presented to the FISA/WRC site selection committee, an aerial-view graphic was shown depicting the rowing park which included a boat house projected to cost about $10 million. (See schematic below.) Over $40 public millions have been invested in ongoing park operations/management, WRC event prep, and FISA-approved infrastructure (Phases I/II) at Benderson Rowing Park in advance of the 2017 WRC (including a man-made regatta island).




A public/private partnership is only successful if both partners meet their obligations as pledged. The costs of Phase III structures have been estimated at up to $22 million. Thousands of international rowers and visitors are expected to participate and/or attend the WRC this fall. They expect and deserve to view the WRC at a premier rowing venue.

Nearly a year ago, SANCA Board Chair Bill Robinson noted the following in the Herald Tribune:
".....The finish tower project is estimated to be ready for use by the fall. The planning for the multi-purpose boat house is underway...."
Below, note the statement about the boathouse on the Nathan Benderson Park Foundation website:

The Boathouse, also designed by Guy Peterson, will be located on the south end of Regatta Island, opening out into the widest expanse of Nathan Benderson Park Lake. It will consist of two stories. The Boathouse will feature a variety of rowing and boating bays, supplemented by fitness facilities, dressing rooms, offices and more. The boathouse will commence construction in late 2015 and will be opened prior to the World Rowing Championships in 2017.
As of today, the finish tower is still under construction. There is no boat house, and the rickety grandstands seat about 150 spectators. (See photo below.) Any notion that temporary boat storage tents, grandstands, and rower changing rooms/shower facilities should suffice at a "world-class" venue chosen to host the prestigious World Rowing Championships is unacceptable. Not another nickel in public funding should be used or approved for Phase III structures.



Requests for information: 
  • How much private/corporate funding has been raised to complete the world-class structures depicted to win the bid to host the 2017 World Rowing Championships? 
  • When and where are the WRC Events Committee meetings held? Over $5 million in public revenue is being spent to host this event. Open meetings and public records statutes apply to this project and local residents should have a front row seat as plans are finalized for this international competition. 
  • Please provide evidence that FISA awarded the 2017 WRC to Benderson Rowing Park with the understanding that a permanent boathouse would be optional. Plovdiv, Bulgaria, the other venue competing for the 2017 WRC, already had a fully equipped rowing facility with permanent structures when a venue was selected in 2013. At the bottom of this message, note the boat house requirements for a major international rowing event listed in the 2010 FISA Manual**, Section B.7, starting on Page 100. A copy of the FISA Manual is available upon request. 
  • Please explain the meaning of the following statement below. It appears on P.23 in the Appendix of the attached Bi-County/SANCA WRC Reimbursement Agreement scribbled under the list of capital improvements, e.g, finish tower, boathouse, etc.: 
"SANCA and Benderson Development CCC shall have no obligation for these capital improvements."
It’s incomprehensible how a bid to host a major international rowing event could be submitted apparently without a binding agreement between local parties to deliver the requisite funding to complete the structures and improvements presented to the FISA/WRC site selection committee, the media, local residents, and the rowing world before the event. If Phase III funding goals have not been met, the private sector needs to step up now and finance the permanent structures depicted in the WRC bid presented by SANCA over three and a half years ago.

I hope to hear good news that funding goals have been met to construct a permanent boat house and grandstands in time for the 2017 WRC.

Your prompt response is appreciated.

Pat Rounds
District 1
Sarasota, FL 34235

==

___________________________________________________________

*From a Sarasota County Press Release posted after FISA chose Benderson Rowing Park to host the 2017 WRC (Sept. 2, 2013):
"....More than $40 million in public and private-sector funds have been committed to help transform a former borrow pit into Nathan Benderson Park, the premier rowing venue in North America, capable of hosting an Olympic-caliber event. Sarasota County's investment, $19.5 million, comes from a Tourist Development Tax (TDT), which is paid by visitors to the area. Those funds have paid for Phase I (dredge and fill) and Phase II (installation of park amenities, hardscaping and landscaping). Phase III of the project, construction of a state-of-the-art boathouse, timing towers, grandstands and other amenities, will be funded by SANCA and corporate support..."
________________________________________________________________________________

**From the FISA Manual, 2010, starting on P.100:

B.7. boathouse area - Team Facilities and Services
B.7.1. boathouse area »» Planning
• Permanent rowing venues are usually developed with at least basic permanent boat storage infrastructure.
• If canoeing is developed (or might be in the future), then the needs for both canoeing and rowing have to be accommodated.
• For major rowing events, much more extensive boat storage facilities need to be provided.
• The required space for the entire boathouse area (permanent and temporary) for a major rowing event is approximately 10,000m2.
• There should be adequate covered areas in and around the boathouse area for the Competitors to shelter in the event of rain.
• Olympic Games - in the preparation period before the rowing regatta and during the Olympic Games, separate boathouse facilities have to be provided for canoeing and rowing.
• A large, general storage area must be provided, at least 120m2.
• A high standard of security must be provided during the regatta events.
• A number of water supply points, clearly marked, should be provided for the Competitors where they can get safe and potable water for their water bottles and other larger containers.
• All Competitors’ areas must be clearly marked as non-smoking areas.
• When choosing the location of the permanent boathouse facilities the following conditions should be considered:
-- It is essential that there should be an easy and comfortable access to the boat storage area for the loading, unloading and movement of the boat trailers.
-- The terrain should be flat, or with a slope if possible of no more than 10°.
-- The terrain shouldn’t be slippery or if covered with gravel it should be well stamped. It is important that the ground conditions can remain usable even in heavy rain.
-- Provisions to be made for the facilities to be used by adaptive rowers.

Thursday, January 5, 2017

The VUE: Model or Mistake? BGA Event

BETTER GOVERNMENT ASSOCIATION
OF
SARASOTA COUNTY

Invites you to a free, non-partisan forum on



THE VUE:  MODEL OR MISTAKE?


Where:  Selby Library Auditorium, 1331 First St.Sarasota

When:  Saturday, February 11, 2017, 2:00-4:00 PM

Presenters:

David Smith, General Manager, Neighborhood and
          Development Services Department, City of Sarasota
                             
Mollie CardimoneSteering Committee Member, STOP!
        Former Mayor and Sarasota City Commissioner

Jennifer Ahearn-Koch, Founding member of STOP!
        Former Sarasota City Planning Board Member

Ken Shelin, Co-Chair, Equality Florida Board
         Former Sarasota City Commissioner

Questions and comments will be taken from attendees.

Monday, January 2, 2017

Developer-tailored Amendment to Greenway and Open Space Policies?

Public Notice

Proposed Amendment to the Sarasota County Comprehensive Plan
The Sarasota County Planning and Development Services Department will hold two public meetings on proposed Comprehensive Plan Amendment No. 2015-G. Both meetings will present the same information. These are not public hearings. The purpose of the meeting is to inform the public about the content of the proposed amendment and to seek comments and suggestions regarding the amendment.
The public meetings will be held on:

Date:                 January 18, 2017
Time:                 6:00 p.m.
Location:            Gulf Gate Library, 7112 Curtiss Ave., Meeting Room B, Sarasota

Date:                 January 25, 2017
Time:                 6:00 p.m.
Location:            Englewood Sports Complex, 1300 S. River Rd, Englewood

The publicly-initiated amendment is related to the required Open Space and Greenbelts for 2050 Village developments, and proposes to revise Policies VOS5.1, VOS1.2.a, and VOS2.1 of the Sarasota County Comprehensive Plan, Future Land Use Chapter, Sarasota 2050 RMA System section, and other policies as necessary.
The amendments could allow the County Commission to:

1. Grant requests for exceptions and/or reduction of the required 500-foot Greenbelt widths of a 2050 Village, with established criteria; and

2. Grant requests to reduce the Open Space of a 2050 Village to less than the required 50%, but to no less than a minimum of 33%, with established criteria.
For more information or to send written comments on the proposed amendment, contact:

Planning and Development Services Department
1660 Ringling Blvd, 1st Floor
Sarasota FL 34236

Please call 941-861-5000 or email planner@scgov.net with your questions.


Planning Services provides unincorporated Sarasota County with land use services in collaboration with businesses, residents and neighboring jurisdictions to build a sustainable, prosperous community that distinguishes Sarasota County.
Planning Services |  planner@scgov.net | 941-861-5000
 www.scgov.net/planningservices
See what's happening on our social sites:
FacebookTwitterLinkedInPinterest

Tuesday, December 20, 2016

Neighborhood opposes Benderson at Stickney Point - Update


A neighborhood workshop on Monday asked area residents for their wish lists of feasibility studies for a planned development at the key intersection of U.S. 41 and Stickney Point Road.

But most of them just wish the project wouldn't move forward at all.

Siesta Promenade, a hotly contested mixed-use development, was back in the public eye Monday for the first time since early October, when Sarasota County tabled the discussion to set a Critical Area Plan boundary. The public workshop was designed so the Manatee County-based Benderson Development Co. and Sarasota County could collect public input about what would be included in the scope of work for the project that's expected to break ground sometime next year.

Read more...

Photo from Herald Tribune

A citizen's response to the Siesta Promenade traffic issue, sent to the HT reporter:

I went to two of the Benderson meetings and signed the sheet for continued updates and received nothing.  Therefore, I missed this last meeting.  Not happy! 
Benderson has a history of morphing situations into what ever they want.  Look at the original proposals for the town center.  It was supposed to be a smart growth development. Here we go again with Siesta Promenade. Traffic studies are antiquated and the community and visitors are left with ever increasing safety issues. I attempted to get the latest comprehensive plan update to recognize this and put effort in developing a more relevant/ safety conscious traffic study connected directly with the building approval process. People have listened but the many stakeholders have no impetus to take the necessary steps. I've explored many avenues. 
I have come to the conclusion that a state comprehensive plan amendment will force the need. 
Data presently isn't designed for the need.  I've tried for months to get at the requirements for evacuation routes and who is in charge and monitors these .  Yes, there seems to be some requirements and Siesta Promenade, Fruitville, Bee Ridge and others all are designated evacuation routes. 
There are silos of interests here that are not combining efforts to put safety first.
Maybe this is some fuel for future articles. 
Sincerely, 
Vicki Nighswander MAT, MPH
Sarasota


Monday, December 19, 2016

Updates: Go Solar -- Learn How on January 4 at Florida House

Updates:

1. The co-op will need 40 participating households to start in earnest, and information sessions will be held over the next couple months to inform interested residents. Events scheduled so far include 
  • January 18 at 1 pm at the Venice Community Center
  • January 19 at 5 pm at Selby Library 
  • February 24 at 11 am at Twin Lakes Park.



============

The Florida House Institute, in coordination with the Sarasota League of Women Voters, Gulf Coast Community Foundation and other local partners, is working with the Florida Solar United Neighborhoods (http://www.flsun.org/sarasota/) to engage Sarasota County homeowners to create a solar cooperative. 

Interested homeowners across many Sarasota neighborhoods would form a cooperative using the expertise of the FLSUN sponsors to develop construction standards and engage qualified contractor(s) for the installation of solar panels. 

The cooperative would use the buying power of scale to get a discounted price for solar panels for participants.


Go Solar

Sunday, December 11, 2016

Mele on mining, development, and environmental peril

Andy Mele, vice-chairman of the Sierra Club, Sarasota Manatee Group, and Suncoast Waterkeeper, offers some honest words about the phosphate industry, about freewheeling Sarasota developers, and the dire impacts on the environment now, with worse in the years to come.

Mele was interviewed on WSLR on Wednesday, December 7, 2016.

Excerpt on development and Comp Plan machinations in Sarasota County (6 mins)

Full Interview: Phosphate Mining in Manatee - Mosaic hearing Jan. 26, 2017 - Democrats' failure - current developer activity in Sarasota and Manatee counties - Pat Neal, Carlos Beruff, Benderson - future "feeding frenzy" east of I-75. (26 mins)



Audio interview thanks to:
WSLR Peace and Justice Report 9am on Wednesday
wslr.org 96.5 LPFM

Photo credit: Sarasota Observer

Wednesday, December 7, 2016

The Late Waldo Proffitt Jr. on Growth


Longtime editorial writer and managing editor of the Herald TribuneWaldo Proffitt Jr. died Dec. 6. This reflection was shared with us by Dan Lobeck:


Waldo Proffitt Jr.

October 8, 1924 - December 6, 2016


As Managing Editor of the Sarasota Herald-Tribune from 1961-1998, and as a columnist and editorial writer,
Waldo Proffitt  helped shape Sarasota County for the better (together for most of that time with Publisher David Lindsay).  

He always favored carefully managed and controlled growth, as reflected in these interview excerpts.
Waldo Proffitt is greatly missed.

From an Interview – 10/16/2013:
 … growth is not necessarily good, it’s only the right kind of growth that will help the community remain a good place for people to live and that is the product that Sarasota has to sell: that this is a good place to live. And I believe that that idea has become fairly widely circulated, I certainly hope so.

...

Well, don’t let yourself get overwhelmed by density. I mean that’s not easy to do, because the more people you can pack into a given area, the more money you can make.

...

I’m very fond of Siesta Key but the fact is that now it is getting overpopulated and unless we are very careful about what we allow to be built in there, it can have an negative impact on the quality of life, and that is, I think, a statement that I think could be applied to almost any waterfront community— they are very sensitive to density.

...
From an Interview – 8/27/2003:

WP: 

I always tried to sell the concept that growth is good up to a point … I can tell you what the maximum population [of Sarasota County] will be. I figured it out to be 1.6 billion. The population of Sarasota County would give you twelve square feet for every person to lie down in the sun, and you couldn’t have any double decking because everybody wants to get the sunshine. … then you can start asking the question, how much growth should we have? Then you start asking a whole different set of questions, and then you’ve come to the concept of sustainability. How much growth can we sustain over the long haul based on the resources available? The truth is we don’t know, and people have thought about this and they still don’t know. We will never get a satisfactory answer to that question, but as long as you keep asking the question, you get people in a mind-set where they are not afraid to say, no, you can’t do that because that is something we can’t sustain over the long haul. We can’t follow this precedent.

Question: In very specific cases, if we look at Southwest Florida, already there are issues of water, pollution, and traffic. Once that starts impacting the life of an average citizen of this community, they are going to start complaining.

WP: Yes, and [they] have.

Question: But the power of the developers is that they will say, look, we want to expand, that’s jobs, more people come, more businesses, it helps the economy, more taxes, better schools, that growth is not only essential but beneficial. How do you counteract those kinds of statements?

WP: In the first place, you go back and examine the tax history in the county, which I don’t think anybody has done recently but I did several times and printed the results. The truth of the matter is that as the community grows, the per capita tax rises. Growth doesn’t lower your taxes; it actually raises them. I think in most any situation, you can check the tax records and that is what happens. 


Monday, November 21, 2016

Planner responds to Sarasota Survey on Affordable Housing

A recent Sarasota County survey on affordable housing recently circulated. Daniel Herridges, a member of the Citizens for Sarasota County group on Facebook, posted his responses. Herridges is doing graduate work in Urban and Regional Planning.


The County survey is open to all citizens through Dec. 12. All residents are urged to take the Affordability Survey here.

========

Sarasota County Affordable Housing Survey Responses


DANIEL HERRIGES·SUNDAY, NOVEMBER 20, 2016


1. Do you believe it is important for housing to be affordable for people who work in our community? Why or why not?

It is extremely important. Sarasota's quality of life depends on broadly shared prosperity. Our region's economy is heavily dependent on service-industry jobs. If enough affordable, decent housing is not available for those who work those jobs, we can expect to see worse traffic and environmental impacts as workers commute from far from their jobs; higher cost of living combined with slower economic growth; increased health problems as more people live in housing that is in poor condition; increased homelessness (already a pressing quality-of-life issue in downtown Sarasota and elsewhere); and potential negative effects on schools, crime rates, and neighborhood stability resulting from high socioeconomic inequality.


2. What type of workers is it important to have housing for? ( i.e. teachers, nurses, construction, manufacturing, government/private sector, etc.)

All types of workers need reasonable, healthy, safe housing, whatever their occupation or income level. I see the most dire need in Sarasota County being among low-wage service-industry workers, however—retail salespeople, servers, bartenders, customer service / receptionists, etc. I am dismayed that nearly all of the discourse around affordable housing from the County centers around "workforce housing" for moderate-income teachers, police, firefighters, etc.—while these groups do need housing as well, this focus is limiting. The most dire housing need is among residents with low and very low incomes (under 80% of AMI). I understand the political palatability of "workforce" versus "affordable" or "low-income" housing, but I hope County officials can also show the political courage to pay due attention to their neediest citizens. 



Affordable Housing
3. What makes it difficult for these workers to find affordable housing?

Wages in Sarasota County, as in all of Florida, are below average for the United States. The region has a disproportionate concentration of low-wage jobs in the service industries, and a relative dearth of scientific and technical jobs. This means there is structurally high demand for affordable housing. At the same time, with high migration driven by retiring baby-boomers, there is steady demand from outside the region for larger and more expensive homes, thus our home builders see little incentive to build "starter homes" or apartments when they have a profitable business model in higher-end, single-family subdivisions. Finally, the region's land-use policies stifle the organic growth of an affordable housing stock by largely disallowing "missing middle" housing types (buildings with 2-20 units), disallowing multifamily housing entirely in many locations, disallowing ADUs almost everywhere, and making it difficult to economically build small "starter" homes on small lots due to lot size and setback requirements. Sprawling, low-density suburban growth and a lack of infill development means that transportation costs eat up a high share of many households' budgets. Finally, the large-scale subdivision growth model (as opposed to incremental infill) means that whole neighborhoods are built out at the same time and age at the same rate; thus, almost nowhere in Sarasota County is there a diversity of housing age, size, condition, and thus affordability within one neighborhood like you find in many older U.S. cities. This makes it hard for young professionals to establish themselves here and for older people to downsize and age in place. 


4. What creative ideas do you have to removing the barriers to finding affordable housing?

Dedicate county-owned properties acquired through tax forfeiture to permanently-affordable housing. Seek to create a permanent, replenishable fund at the county level for gap financing to help nonprofit developers make affordable projects pencil out (meeting the “gap” between federal / state subsidies, the developer’s own financing sources, and total development costs). Reform land-use policy to broadly allow small, inherently affordable housing types like ADUs. Couple mandatory inclusionary zoning with density bonuses / exemption from things like setback requirements to incentivize the building of smaller housing units. Identify infill opportunities for larger multifamily projects on key transportation corridors (such as aging shopping centers in places like Clark Road and Tamiami Trail), zone these sites in advance for high-density mixed-use to ease the regulatory process, and work with land owners and developers if and when redevelopment occurs to ensure that plans have a housing component. New supply overall will help restrain prices in the region's housing market, but priority should be on encouraging rental housing, smaller units whether rental or ownership, and infill rather than greenfield development. "Affordable" housing in remote areas of North Port or east of I-75 is NOT affordable once transportation costs are factored into a household's budget! Do not let developers use "affordable housing" as a pretext for accelerated greenfield sprawl or exemption from the letter or spirit of 2050 requirements. 


5. What are the five most important reasons having housing affordable to these workers positively impacts the community?

Less inequality is associated with stronger economic growth. Workforce housing helps area employers attract workers and diversify the regional economy. Diversity of housing types and price points will help Sarasota weather boom-and-bust cycles better. Affordable housing near jobs restrains sprawl, resulting in less traffic and cleaner air. It's the right thing to do. Everyone should have access to adequate, safe housing.


6. Are there any particular areas or locations that make more sense than others to encourage or allow additional housing? (i.e. address, parcel, new developments, in existing developments, west of I-75, etc.) 

Along existing major transit corridors (coupled with increased transit investment to meet mobility needs that come with greater population). In existing neighborhoods in the form of ADUs. In older retail centers ripe for redevelopment—many of these have huge parking lots that are sparsely used even at peak hours and could be partially redeveloped as housing. Near major job concentrations (downtowns, hospitals, on the mainland near barrier islands). West of 75 almost exclusively! (Only exception: Lakewood Ranch) We have so much room for infill that it is environmentally and fiscally irresponsible to allow continued sprawl into greenfield areas, whether in the name of affordable housing or not.

A citizen's questions about Sarasota County traffic & safety

Traffic is probably the highest priority concern for residents of Sarasota County - it raises issues of safety, civic welfare, and quality of life.

Vicki Nighswander has been highlighting road safety and traffic for some time, and had researched many relevant aspects of this problem that is worsening with overdevelopment, as we see every day.

Below is Nighswander's email to the Sarasota County Commission. Her questions are in italics, with inline responses from Paula Wiggins, transportation manager for Sarasota County, indented.

Wiggins prefaced her inline comments as follows:
Thank you for voicing your concerns about the mobility and safety of Sarasota County’s transportation network. Please know that the safety of the citizens and users of the county’s roadways are of the utmost importance to our Transportation staff. That being said, please see staff’s responses to your questions below. Should you have additional questions regarding this information, please contact me.

From: Vicki Nighswander <nighswan1@gmail.com>
Sent: Tuesday, October 25, 2016 3:34 PM
To: Allen Parsons; Alan Maio; Paul Caragiulo; Charles D. Hines; Carolyn Mason; Christine Robinson
Subject: Comprehensive Plan Update Input

Dear Planners And Commissioners,

I have spoken with County Staff, City staff, emergency management staff, FDOT, MPO and communication with the MPO, politicians and most recently with a consultant to the Regional Planning Council and still don't have answers to some very basic questions that should form the basis for decision making if safety's truly on the forefront of decision making which should be guiding growth decisions.

What are the construction requirements for designated evacuation roads?  One engineer mentioned that they are supposed to be Functionally Classified Routes but who monitors this?

           In Sarasota County, designated evacuation routes are to be built so they do not flood in a 100-year storm event.  A 100-year storm event means that there is a 1 percent chance of a 100-year storm occurring in any given year.   Evacuation routes are designated by county emergency management officials.  See below link for further details included in the State of Florida Administrative Code. 

Shouldn't there be a study on how to move people around most effectively and efficiently with each new building and development approval process?

·         Developers are required to submit traffic studies for developments that generate 100 pm peak hour trips or more to determine their impacts on the roadway network. For those developments generating less than 100 pm peak hour trips, staff evaluates those impacts. As part of the evaluations crash data is reviewed.


For that matter, when was the last time the traffic analysis process evaluated for validity and whether it meets present needs particularly around safety?

·         Every five years the Sarasota Manatee MPO evaluates the roadway network for the two counties and their respective municipalities. This information is used to determine the Needs Plan for the bi-county region. The most recent analysis occurred last year, with the adoption of the 2040 Long Range Transportation Plan. In addition, Sarasota County Transportation Department evaluates crash data and levels of congestion on thoroughfare roadways annually.

Shouldn't comprehensive crash data and trends and analysis for the last 5-10 years be an integral component of the building and development approval process and include both county and state data?  Still County data doesn't include on and off ramps to 75, nor 75 and probably not other state roads.  Once again, I requested such data with now basically a run around and even a referral to a private service that charges $90.00/hr.  for this public data.

·         Crash data is considered as part of the traffic analysis when considering new developments and we do have access to data on I-75 and the on/off ramps as well.

Until ongoing needs are routinely captured and addressed, I see this comprehensive Plan as a stagnant bible falling short of what it could be. I do see promise in what's coming down the pike the National Performance Management Measures that will force decision making to be more strategic regarding highways and traffic.  I have been asking the question for some time "how do you measure success?"

·         Sarasota County does have performance measures related to traffic.  These are as follows:
  • o   Crash Rate by Population ≤ to 3%
  • §  For calendar year 2015 this was 2.4%
  • o   % of Lane Miles that Meet adopted LOS
  • §  For calendar year 2015 this was 90.06%


At this time, I wish to go on record with a vote of no confidence in the Boards action on the 2016 Comprehensive Plan update.

Sincerely,
Vicki Nighswander 

Tuesday, November 15, 2016

Two visions of East Sarasota County

Last week, the Sarasota County Commission approved LT Ranch -- a 3,450-home project to occupy 1,700 acres a little bit east of I-75 on Clark Road. The vote was 4-1.

Many questions about the exceptions, bent rules, and questionable environmental judgments surround that approval -- more may be forthcoming (Video BCC, Nov. 9th). What deserves mention just now is not the plan, but rather the plea put forward by Commissioner Charles Hines. Hines voted against the project, though he said many of its elements were "great."


Charles Hines
 Photo from SarasotaNewsLeader.com
The reason for his vote was simple: The developer wanted to come in east of I-75 on Clark Rd, which currently has the look and feel of an old country road, and remove a 500-foot buffer requirement in order to locate a 300,000-square-foot shopping center at roadside with a 10-foot buffer.

Such a radical change would destroy the entire look of the road, said Hines. It would also set a precedent for future developers who will seek the same exemptions, exceptions, and bent-out-of-shape-rules for their projects east of the Interstate. There is no need for giant Walgreen signs looming over Clark Road -- the eastern sector of Sarasota county was supposed to be different, Hines said.

Charles Bailey, attorney for the Turner family that is selling the parcel to Taylor Morrison, one of the largest homebuilders in the nation, huddled for a few minutes with his clients, then returned with a counter-offer -- instead of a 10-foot buffer, he said, how about 20 feet?

Hines looked stunned. Red-faced. "I'm offended," he said.


Hines went on to describe a vision of an old country road -- you drive along, heading to Myakka and Arcadia, and as you look from your car, you see open fields, or homes in the distance. It sounded idyllic - but with a shopping center 20 feet from the curb, not very likely. The Turners and Taylor Morrison - and the four other Commissioners - Maio, Caragiulo, Mason and Robinson - didn't seem to get it. Sure, maybe the 2050 Plan had called for a 500-foot buffer, but when has that ever stopped a wonderful project?

In brief, there is an ontological gap between the vision of old Florida, as it still remains, both in memory and in a few places in real life, like Clark Road -- between this Florida and the ambitions of folks like the Turners, Taylor Morrison, and the four Commissioners, who see real estate, widened roads, and commercial buildings in place of vacant pasture.

Between these two opposing imaginings of Sarasota East, you might think there could be some bridge, some mediating point. But attorney Bailey wasn't going to let his clients down. They came back with the offer of a 50'-foot buffer and a tall hedge. Hines opposed, got no second -- the Commission was not going to postpone approval -- those pasture lands were itching to be developed. The plan with its 50-foot buffer was approved, Hines dissenting.

Hines in fact admired much about the LT Ranch proposal. He just didn't want the entire look of the County to resemble Fort Lauderdale.

"This was such an overreach to jam this commercial right up in front, right on that road," said Hines. "I don’t see the benefit."


This approval was but the crack in the seawall. More developers will soon appear before the County, seeking to bend the 2050 Plan to their profit-driven "density needs." Led by a monolithic Republican business cadre, developers and government will make each other happy as cows leaping for joy. They'll just do their leaping in a Publix parking lot.

We appreciate Commissioner Hines' solo effort to get a developer to honor the 2050 plan and a vision of East Sarasota County. Commissioners Robinson and Mason are gone due to term limits. Commissioners Caragiulo and Maio will stand for election in 2018, when Sarasotans can decide their "future development."


LT Ranch on Clark Rd.